Feature #822
Transport Tool with better merge
Status:
Resolved
Priority:
Normal
Assignee:
-
Category:
z2-base
Target version:
-
Start date:
Due date:
% Done:
0%
Estimated time:
origin:
trac
Updated by Udo Offermann over 11 years ago
- Status changed from New to In Progress
accumulated transport tool improvements
- API refactoring
- adding from with revisions header line to summary page
- Retry on ssl timeouts
- svnkit API updates
- Escaping JIRA commands in transport tool summary
- increasing progress logger max-lines to 10000
- com.zfabrik.dev.transport: when "Filter on User's projects" is set the
transport contains only changes up to the latest user's revision (per
project)
User X has changed projects A, B & C within a revision range from #1000
to #1800 in the source repo, while HEAD is at #2000. User X has changed
project A on revisions #1100, #1200 & #1300, project B on #1150, #1350
and #1550 and project C on #1600 and #1800.
The Transport tool will create the delta workspace for project A
considering changes up to revision #1300, for project B up to #1550 and
project c up to #1800, ignoring all later changes
- com.zfabrik.transport/tool: add "only user's project" filter, so that
only projects are provided that were changed by the user in the given
revision range